"Execute R code gives missing data for date values"

User50676User50676 Member Posts: 5 Contributor I
edited June 2019 in Help
I have the following code in R Studio:



This gives the following results:

I have put the code in Execute R which is as follows:


This gives the following results set:



The dates have missing values?
Is it something to do with date formats in R and Rapid Miner?  Please assist.

My XML code is as follows:


<?xml version="1.0" encoding="UTF-8"?>
Tagged:

Best Answer

Answers

Sign In or Register to comment.